Future Fluency · Level 3
Applied Project: Improving Own Work with AI
This unit is the applied project that carries the Diploma to its size.
- 100 hours
- 5 steps
- 26 criteria
- ZFF-PJ-03
How the Unit Runs
Five Steps Through This Unit
The unit in one paragraph
Over a period long enough for things to go wrong, the learner takes one recurring process in their own work, records how it runs today and what it costs in time, redesigns it using the practices from the earlier units, runs the new version until it fails at least once, fixes what failed, measures the before and after, and reports to their manager with a recommendation about whether to keep it.
-
Step 1 · 5 criteria Be able to establish how a recurring process in own work runs at present.
- 1.1 Select a recurring process in own work to improve, within the project brief
- 1.2 Record how the process runs at present, step by step
- 1.3 Establish what the process costs in time at present, and state how that was established
- 1.4 Identify the points in the process where errors or delays occur
- 1.5 State the requirements the improved process must continue to meet
-
Step 2 · 6 criteria Be able to plan an improvement to a recurring process.
- 2.1 Identify the steps of the process that could be improved using AI or automation
- 2.2 Select the changes to be made, and state the reasons for the selection
- 2.3 Identify a change that was considered and set aside, and state why
- 2.4 State what is expected to improve, and how that will be measured
- 2.5 Identify what could go wrong, and state what will be done if it does
- 2.6 Check the planned changes against workplace rules on the use of AI
-
Step 3 · 4 criteria Be able to carry out a planned improvement and record what happens.
- 3.1 Carry out the planned changes to the process
- 3.2 Run the improved process over an agreed period
- 3.3 Keep a record of how the improved process performed, including occasions when it did not work
- 3.4 Record any point at which the original method had to be returned to, and the reasons
-
Step 4 · 5 criteria Be able to respond to problems arising during an improvement.
- 4.1 Identify a problem that arose during the period the improved process ran
- 4.2 Use appropriate investigation to establish its cause
- 4.3 Select and carry out a correction, and state the reasons for the choice
- 4.4 Record whether the correction resolved the problem
- 4.5 Identify a problem that was not resolved, and state what was done about it
-
Step 5 · 6 criteria Be able to measure and report the effect of an improvement.
- 5.1 Establish what the improved process costs in time, on the same basis as 1.3
- 5.2 Interpret the before and after measurements and state what they indicate
- 5.3 Evaluate whether the improvement met what was expected at 2.4, giving reasons
- 5.4 State a recommendation to own manager about whether to keep the improved process
- 5.5 Present the recommendation with the evidence that supports it
- 5.6 Review own approach to the project and identify what would be done differently
- Start at Step 1 Start This Unit